hToLek^1F).RrB!Up;Y!Di12b!GfcKLl3UK`$L4%,eoryy{w"=D$BVzI"] 9.4.1 Installed flooring shall be protected from damage by use of heavy Kraft paper or other covering. 0000007419 00000 n 0000008445 00000 n Superintendncia de Tecnologia da Informao. 9.3.1 All tiles shall be laid symmetrically about axis line, and toward outside edges, both directions. 0000027316 00000 n 0000004455 00000 n He shall observe and implement proper execution of the work and responsible for implementation of HSE on the site. 9.2.4 Where-ever openings are required, steel base structure shall be installed and anchored firmly to the concrete slab for future panel board installations. 1 Sq~1Z2T}+MS\JWb+3Gr~t;7W6wTdx]vjCS))rmuc/\F()~24csE$7nu;y!E:Y2yEsT Marbleized pattern shall run in short direction of each room, unless noted otherwise. G4WjcZ;daMCD8HKMWb*5UI 0000017716 00000 n Est al tanto de los eventos relacionados a nuestro Programa de Posgraduacin. The QC Inspector is responsible to conduct daily surveillance and inspections as necessary in accordance with this procedure and project quality requirement. 3) Hot Dip galvanized stranger. 0000003655 00000 n :}m8K{dvg?72{j!.("M@&i#I;-RSyMwd#~* _W:y|xzn4n$V(i?|"jRelNT0YUz^6bv[Hb 8(l4'a(=I(BY5y\7Z~H=O[pSXOS0h(Xs&fk64_rbQbTRz4J z"*f@=.ypI=rvz The Safety Supervisor shall ensure that all workers are in compliance with the requirements of the safety manual. Accordance with the requirements of CONTRACTOR/COMPANY drawings, specifications & standards. He will ensure all the material & method statement is approved prior to start of work. 4. 9.4.2 After completion of the project and just prior to the final inspection of the work, floors and accessories shall be thoroughly cleaned. 0000002037 00000 n SAES-M-100 Saudi Aramco Building Code SAES-J-801 Control buildings SAES-B-014 Safety Requirements for Plant& operation support buildings b) MANUFACTURERS CATALOGUE, e) SAUDI ARAMCO INSPECTION TEST PLAN OF CHECK LIST a) SATIP-M-100-11 SATIP for Raised Equipment Floor System b) SAIC-M-1075 SAIC for materials receiving & storage inspection c) SAIC-M-1055 SAIC for raised equipment system installation & final installation. 0000009046 00000 n Refer To Approved MAR (AL-MAR-054, T-AL-DW-0210) 9.1.4 Gypsum Board System should be applied under raised floor system where it is required as per design drawings. 1) Hot dip galvanized adjustable pedestals height @600mm. 0000015000 00000 n O curso de Mestrado Acadmico em Letras funciona no turno vespertino, no Centro de Cincias Humanas - CCH. To ensure execution of Raised Access Floor System for PIB 010, PIB014 buildings for Rack Room, Air lock Room, and Telecom Room are meeting with all quality and safety requirements under the above Referenced project. 9.1.2 Surface shall be smooth and level at the required finish elevation. If required additional L support for side of wall and panels should be installed as per approved IFC drawing. 0000004693 00000 n <]/Prev 1333717>> 0000009569 00000 n 0000003147 00000 n RESPONSIBILITIES 7. %PDF-1.5 % Refer to approved shop drawings (T-AL-DW-0333). For Fixing Bolts, Refer To Approved MAR (AL-MAR-097, T-AL-DW-0343). H5OC(Q; >QGhXT5i,ey)! The Site Manager shall ensure compliance by all foremen, labors and other craftsmen to the requirements of this procedure. 0000033954 00000 n 1/kk7Bm C. He will ensure that all work is inspected and accepted as per Aramco requirement & SATIP. 9.2.3 Once after the entire pedestal base adhesive has dried, all the accessories of understructure shall be installed leveled and squareness shall be checked & if required adjustment shall be made. 9.3.2 All surfaces shall be in true, level plane, with no raise corners or edges. 0000006314 00000 n 329 0 obj <> endobj b) Access Raised Floor Tiles. He will explain QC requirement for installation of raised floor to PM, site representative & QC supervisor/inspector by coordination with them. 2) Fixing bolts. MATERIAL STORAGE 9. But if due to site condition door frame installation is not possible prior to raised flooring, care should be taken for top surface level marking of raised flooring. 0000007020 00000 n AGEUFMA - Agncia de Inovao, Empreendedorismo, Pesquisa, Ps-Graduao e Internacionalizao. Matrcula para el perodo Para obter informaes atuais e completas sobre o PGLetras-UFMA acesse nossa pgina em http://www.pgletras.ufma.br/ The Site Supervisor and/or Foreman are solely responsible in assuring that all materials installed permanently and works being implemented are in conformance with specifications and manufactures recommendation. Tile Size (600*600) mm Anti-Static Vinyl Tile & Composition Vinyl Tile. 0000005620 00000 n 0000011842 00000 n The latest revision of COMPANYs Project Specifications shall be used as references and shall be the part of this Method of Statement during work execution. Materials shall be stored in original packing in accordance with manufacturers instructions and recommendations and Saudi Aramco standards requirements. 358 0 obj <>stream Holes for pipes shall be cut neatly so that floor plates or flanges cover same. 0000012350 00000 n O Programa de Ps-Graduao em Letras decorre de uma proposta apresentada pelo Departamento de Letras da Universidade Federal do Maranho e elaborada em consonncia com os dispositivos do Estatuto, do Regimento Geral, do Regimento dos Cursos de Ps-Graduao stricto sensu e lato sensu da UFMA e deste Regimento Interno, estando previsto no Plano de Desenvolvimento Institucional - PDI - 2012-2016.O Curso de Mestrado Acadmico em Letras, do Programa de Ps-Graduao em Letras - PGLetras, aprovado pela Resoluo 1007/2013 - CONSEPE-UFMA, de 6 de maio de 2013, e recomendado pela CAPES com nota 3 e rea de concentrao em Estudos da Linguagem, est estruturado em trs linhas de pesquisa: Linha 1 - Descrio e Anlise do Portugus Brasileiro; Linha 2 - Estudos de Linguagem e Prticas Discursivas e 3- Estudos Tericos e Crticos em Literatura. DEFINITIONS 5. endstream endobj 330 0 obj <>>> endobj 331 0 obj <>/ExtGState<>/Font<>/ProcSet[/PDF/Text/ImageC]/XObject<>>>/Rotate 0/TrimBox[0.0 0.0 595.276 841.89]/Type/Page>> endobj 332 0 obj <> endobj 333 0 obj <> endobj 334 0 obj <> endobj 335 0 obj [/ICCBased 352 0 R] endobj 336 0 obj <> endobj 337 0 obj <> endobj 338 0 obj <> endobj 339 0 obj <>stream l*O RAISED ACCESS FLOOR SYSTEM INSTALLATION PROCEDURE | METHOD STATEMENT. H\0Xif$]Ehpl%54Q}gt.L4?bcRM{ He will ensure that raised floor installers are trained and skilled & if required he will arrange training for them. 9.2.1 As per approved shop drawing layout, all the pedestal locations shall be laid-out on the floor and marked. REFERENCE 6. 329 30 9.3.3 Edges of all tiles shall be cut to fit accurately at walls vertical surfaces, offsets and at jointing of tile and other floor finishes. Raised Access Floor System for buildings for Rack Room, Air lock Room, and Telecom Room. 0000010175 00000 n For Access Raised Floor System and Tiles, Refer To Approved MAR (AL-MAR-092, T-ALDW-0335). 0 He shall arrange the manpower, equipment and materials required for the Implementation of the works, coordinate with HSE Officer and QA/QC Site Manager involved in the tasks in accordance to the method statement. 0000000016 00000 n 0000011306 00000 n Method Statement : A written document that gives specific instructions on how to perform a work related task safely or safe operation plan using tools and equipment. 0000002607 00000 n 0000000896 00000 n 9.1.5 Door frame should be installed prior to start installation of raised floor system. startxref The Site Building Engineer has the overall responsibility for the implementation of work as per Approved drawings. 9.1.3 If required as per approved design drawings, requirements for dust proof epoxy coating as approved shall be applied. Tile shall be laid in straight line, in perfect alignment, without offsets in joints and as per manufacturers instructions & recommendations. The purpose of this Method Statement is to describe in detail the appropriate requirement for Raised Access Floor System for buildings for Rack Room, Air lock Room, and Telecom Room. xref trailer PROCEDURE. 0000002151 00000 n 0000005108 00000 n 0000004606 00000 n 0000004492 00000 n %%EOF 9.1.1 The areas and conditions shall be examined under which raised flooring is to be installed. He is responsible for monitoring the work area for any unsafe conditions and make corrective actions where necessary. All joints shall be tight, closed and evened. 0000010740 00000 n 9.2.2 Utilizing manufacturer/suppliers recommended adhesive, entire pedestal base shall be firmly fixed on the floor and shall be left overnight for drying. 2022.1. He will identify any potential nonconformance & suggest preventive action to eliminate occurrence of nonconformance. wRP( 8x(]pop%\t -pNnD'D:(7`?fqB#Sp\7AecEe}M`*7{Q [ u!` Prepare quality control records and documentation to secure completion of activity for final acceptance and handover. 0000024351 00000 n MATERIALS 8. 0000007904 00000 n b*1KRJg=+Ud\\LC{$#kv?
Neutrogena Healthy Skin Eye Cream Ingredients, Daisy Dream Forever Marc Jacobs, Heart Keychain For Couples, Current Medical Research And Opinion Acceptance Rate, Cressi Snorkeling Sets Palau Saf Bag Set, Poly Sprayer Fittings, How To Clean Bathroom Marble Floor Stains, Revlon Photoready Eye Contour Kit 505, Puma Compression Shirt,